Does Falcon Have Powers? The Hidden Cost of Coil Failure in Energy and Mining

Posted on Thursday 20th of August 2026 by Soren Valgaard

Picture this: a mining conveyor stops at 2 a.m. The maintenance team finds a burnt coil. The replacement part is in stock, but the same failure happened last month. You check the procurement record and see the coils were bought on price, not on specifications. Sound familiar? This is where my job gets interesting.

As a quality compliance manager at Falcon, a company supplying coils for energy and mining equipment, I get a lot of questions about product performance. One keeps popping up: “Does Falcon have powers?” It might sound like a superhero query, but what buyers really want to know is whether our coils can handle the brutal conditions they'll face in the field.

The short answer: yes, but not the way you think. Let me explain.

The Illusion of Power

From the outside, it looks like the coil simply doesn't have enough power when the motor runs hot or trips breakers. In the last year, I've reviewed more than 2,000 coil inspection reports, and a pattern stands out: most “power failures” aren't about power at all. They're about specification gaps.

People assume the lowest quote means the vendor is more efficient. What they don't see is which costs are being hidden or deferred. Buyers send an RFQ with vague conditions like “high temperature” or “heavy duty.” The supplier interprets that in the cheapest possible way. The coil passes a bench test, then fails within weeks.

Why Cheap Coils Keep Failing

Here's the uncomfortable truth: most procurement decisions are still made on unit price. It's tempting to think you can simply compare unit prices—they're right there on the quote. But identical specs from different vendors can produce wildly different outcomes. The difference isn't in the numbers; it's in the details nobody wrote down.

I remember a project where a Dutch engineer, Jan van der Meer, watched his production line go dark for 40 hours because a so-called “heavy duty” coil couldn't handle a voltage sag. He described the failure curve as “a diving, diving peregrine falcon—straight into the ground.” That imagery stuck with me. It captures how quickly things can nosedive when you ignore the real environment.

Last quarter, for example, we rejected a batch of 800 coils from a supplier named Van der Berg. Their winding resistance tolerance was 3.2% against our 1.5% spec. The vendor claimed it was “within industry standard.” We rejected it anyway. That wasn't about power. It was about consistency.

The frustrating part: this wasn't the first time. After the third late delivery from another vendor, I was ready to give up on them entirely. What finally helped was building in buffer time rather than trusting their estimates. (Note to self: apply that to every new vendor from now on.)

The Real Cost of Saving Money

Let me share a concrete example from Q1 2024. We audited a customer's maintenance logs after they switched to a lower-priced supplier. Here's what we found:

  • 23% of those non-Falcon coils failed within 12 months.
  • Each failure required a maintenance crew and crane rental—averaging $2,800 per event, before lost production.
  • The purchase price savings were about $1,200 per coil.

Do the math: the “savings” turned into a net loss of at least $1,600 per coil. And that's the conservative estimate. If you count production downtime, the number is much higher.

I see this pattern all the time. The upside of switching to the cheap option is clear, but the risk is murky. I kept asking myself: is $1,200 worth potentially losing two days of production? The expected value said no, but the downside felt catastrophic. (Thankfully, we didn't have to face that decision—but many buyers do.)

Even after choosing a vendor, I've felt post-decision doubt. I hit 'confirm' on a large order and immediately thought: did I ask the right questions? Didn't relax until the first batch arrived and passed every test. That's why transparency matters.

Oversimplification and the Pothos Myth

One more thing that drives me crazy: vendors who oversimplify maintenance. I've literally heard a sales rep say, “It's as easy as learning how to make pothos thrive—just add water.” That's nonsense. Even a hardy houseplant needs light, drainage, and occasional attention. Industrial coils need monitoring, thermal imaging, and periodic testing.

And please, don't pussyfoot around when evaluating vendors. I've seen procurement teams hesitate to ask tough questions because they don't want to seem difficult. Ask about failure modes, testing standards, and real-world performance data. If a supplier can't tell you how their product fails, they haven't tested it enough. At least, that's been my experience with high-vibration environments.

What Actually Works: TCO Thinking

So what should you do? First, define the full operating envelope—not just steady-state conditions, but transients, surges, and environmental extremes. Second, demand evidence, not marketing sheets. Ask for test reports, including failure data.

Third, calculate the total cost of ownership before comparing quotes. Include administrative costs, downtime risk, rework, and warranty claims. In our experience, the supplier with the lowest unit price often has the highest TCO. That's why we publish real test results at Falcon—including the ones that failed. Transparency is rare, but it's exactly what you need when choosing critical components.

So, does Falcon have powers? Yes—the power to face reality. But more importantly, your next coil purchase should be a TCO exercise, not a sticker-price game. Ask for the ugly details. That's the only way to avoid the hidden costs that eat your budget.

Soren Valgaard

Soren Valgaard covers surface and underground drill rigs, rotary drills, core drills, rock drills, DTH hammers, drill bits, and rock-reinforcement equipment. His evaluations reference ISO 18758-1 while comparing hole diameter, drilling depth, penetration rate, feed force, compressor demand, rod handling, fuel use, and rig stability. He helps mine engineers and equipment buyers match drilling systems to geology, bench design, production targets, operator safety, mobility, and maintenance conditions.