Global crushing support | uptime desk: +1-800-325-2660 | [email protected] EN | LinkedIn | YouTube
Contact

Send Falcon the duty brief.

For the fastest response, include feed material, top size, moisture, required product split, current machine if any, and whether the site needs mobile or fixed equipment.

Global Coverage

Mining, aggregate, and industrial mineral sites across North America, Latin America, Europe, Africa, and Asia-Pacific.

What to include

Falcon can begin with a short note, but a stronger brief reduces follow-up cycles. Share the material type, expected tons per hour, desired output gradation, installation style, power availability, and any recurring maintenance issue. If you have photos of the feed or existing plant, mention them in the message and our team will request the best format.

The team will confirm whether the request fits crushing and screening equipment, then return the next practical step. That may be a quote path, a request for missing data, or a recommendation to review the full circuit before selecting a machine.