These terms describe the general use of the Falcon website and inquiry services.
Falcon publishes product category information, application notes, and inquiry forms for professional B2B evaluation. Website content is provided for initial planning only and does not replace a written quotation, engineering review, site inspection, or signed supply agreement. Any equipment recommendation depends on material data, operating assumptions, site limits, and commercial terms confirmed separately.
Submitting a form does not create a purchase contract. Falcon may request additional information before providing a proposal, including feed analysis, throughput requirements, installation drawings, power availability, and maintenance expectations. A proposal becomes binding only when both parties accept written commercial documents issued for that specific transaction.
Users may not submit false contact information, upload harmful content, interfere with website operation, or use Falcon materials in a misleading way. Product names, descriptions, and visual assets are intended for legitimate industrial procurement and operations review.
Falcon works to keep information accurate, but the website may contain general descriptions that do not fit every site condition. To the fullest extent permitted by law, Falcon is not liable for decisions made solely from website content without a project-specific review.