Global crushing support | uptime desk: +1-800-325-2660 | [email protected] EN | LinkedIn | YouTube
Falcon Insights

Best Halloween Costumes: A Cheap Falcon, a Lincoln Beard, and a $516 Lesson

Posted on Tuesday 18th of August 2026 by Soren Valgaard

The $6 Costume That Cost Me $900

Last October, I watched three grown engineers argue over a broken plastic bird. The bird was supposed to be the Maltese Falcon—the prop from the 1941 movie—but it looked more like a sad parrot with a scratched gold finish. That was the moment I understood that cheap Halloween costumes are not cheap.

Let me rewind a bit. I'm the office administrator for Falcon, an energy and mineral equipment supplier with about 180 employees. I manage the office and event purchasing, which works out to roughly $120,000 a year across seven or eight vendors. When I took over this job in 2020, I learned pretty fast that unit price is the easiest number to focus on. It's also the most misleading.

Last fall, we decided to run an office Halloween costume contest with a new twist: the winner would get a paid half-day off. That changed everything. People started planning in September. A mechanical engineer wanted to do a Humphrey Bogart Maltese Falcon costume, complete with a replica statuette. A technician in the fabrication shop bought a Steelers jersey to mark the Harmon Steelers signing and had already planned his touchdown dance. Our finance director found a stovepipe hat and started practicing his Abraham Lincoln voice. It was going to be one of the best Halloween costumes we'd ever seen in that building.

We held the event in a conference room at our facility near the Lennar Falcon Heights development, which is being built on the old industrial land behind us. The space isn't fancy, but it's free, and it fits about 60 people. We'd done it before, but this time we wanted it to be something people actually remembered.

Then I got an email from a vendor I'd never used before. They were running a promotion on a 40-piece assortment of adult costumes: $15.50 each. Our regular supplier quoted $22.00 each. I did the math in about ten seconds. That's $6.50 a costume, which came to $260 in savings. Against a $1,200 costume budget, that looked like a win. My operations director would love it. So I placed the order and felt smart about it.

I wasn't smart.

The box arrived four days late. Actually, three boxes arrived, all torn, and one looked like it had been returned before. There were no packing slips. The costumes were a mix of leftovers from previous years—a pirate with no hat, an Angry Bird with no beak, and a superhero suit with a torn cape. The Lincoln beard was a thin strip of itchy synthetic hair that would have embarrassed an actual Lincoln impersonator. And the replica Maltese Falcon was a hollow plastic bird with a broken base. It tilted to one side like it had been left in the sun too long.

I'm not a costume expert, so I can't speak to fabric durability or prop design. What I can tell you from a purchasing perspective is this: the unit price was the only thing that looked good. The real cost showed up in the things I didn't check—delivery reliability, product quality, return policy, and the time I'd have to spend fixing the mess.

The technician's Steelers jersey was the only thing that survived, barely. It cost him $28, and the screen printing started peeling after one hand wash. He ended up buying a licensed replacement for $48. The finance director borrowed a nicer Lincoln beard from his nephew's school play. The mechanical engineer tried to glue the Maltese Falcon's head back on. It stayed for about two hours, then fell off again during the party.

By the time the party happened, I had spent an extra $180 on replacement costumes, $76 on expedited shipping, and roughly six hours of my week dealing with customer service, return labels, and an increasingly frustrated engineering team. The $260 I saved had turned into a $516 problem. Not exactly the kind of cost savings I wanted to explain in the monthly report to finance.

A small part of me wanted to file a complaint. The vendor's website used the words 'premium quality.' Per the Federal Trade Commission's advertising guidelines, claims need to be truthful and substantiated. I doubt they could substantiate a hollow plastic bird with a broken base. But I didn't need a government investigation to learn my lesson—the invoice was enough.

Here's the thing: I'm not saying budget options are always bad. Some of our best suppliers are small shops with fair prices. But 'cheap' and 'value' are not the same thing. A $6.50 saving per costume isn't a saving if the costume falls apart, arrives late, or makes your finance director look like a rejected mascot.

Now, before I place an order, I try to estimate the total cost of ownership. That includes the base price, the reliability of the delivery date, the quality of the product, and the cost of a reorder if something goes wrong. It's the same logic I use for our industrial equipment at Falcon. A component that costs 20% less but fails after a month is not a component that saves you money—it's a future warranty claim, a maintenance call, and a delay.

In the end, the contest was still a success. The best Halloween costumes that day weren't the most expensive ones. They were the ones that held together, fit properly, and made people laugh for the right reasons. The mechanic's Steelers jersey got a lot of high-fives. The finance director's Lincoln impersonation, once he had a usable beard, was surprisingly good. And the mechanical engineer's 3D-printed Maltese Falcon—which he made in his garage overnight—was better than the one I'd ordered from the discount vendor.

So if you're planning an office costume event, my advice is simple: don't buy on price alone. Buy from someone you can call when a delivery is late or a falcon's head falls off. Ask for real product photos. Read the return policy. And if a deal looks too cheap to be true, run the total-cost numbers before you click 'place order.'

That $260 'saving' cost me $516 and a week of headaches. The only award I won was the one nobody wants: a procurement lesson I'll remember for a long time.

Soren Valgaard

Soren Valgaard covers surface and underground drill rigs, rotary drills, core drills, rock drills, DTH hammers, drill bits, and rock-reinforcement equipment. His evaluations reference ISO 18758-1 while comparing hole diameter, drilling depth, penetration rate, feed force, compressor demand, rod handling, fuel use, and rig stability. He helps mine engineers and equipment buyers match drilling systems to geology, bench design, production targets, operator safety, mobility, and maintenance conditions.