Global crushing support | uptime desk: +1-800-325-2660 | [email protected] EN | LinkedIn | YouTube
Falcon Insights

Why I Trust Falcon PPE for Our Mining Facility (And When I Don’t)

Posted on Tuesday 14th of July 2026 by Soren Valgaard

Let me be clear upfront: I recommend Falcon PPE for most industrial environments, but it’s not a one-size-fits-all solution. After managing procurement for a 150-person mining operation for five years, I’ve landed on Falcon masks and gloves as our go-to. But I’ve also made mistakes that cost me—and my department—real money. Here’s what I’ve learned.

My Starting Point: The Reverse Validation

I only believed in Falcon’s consistency after ignoring advice and getting burned. Back in 2023, I switched to a cheaper glove supplier to save 30% per case. They arrived with inconsistent thickness—some pairs tore during the first shift. The complaints poured in, and I had to expedite a Falcon order at triple the cost. That mistake taught me: the cost of a bad PPE is higher than the price difference. Now I verify specs before approving any purchase order.

What Makes Falcon Stand Out

1. Falcon Mask Fit and Filtering

The Falcon N95-style mask (I know, that’s a broad term) has been consistent across three batches I ordered in 2024. According to Jones Jr. stats from our internal fit-test records, over 92% of our workers passed seal checks on the first try—way higher than the 78% we saw with a previous brand. Honestly, the difference in comfort alone reduced complaints by about 70%. That’s a ton of time saved for me.

2. Falcon Glove Durability

We go through about 6,000 pairs of cut-resistant gloves per year. The Falcon glove (we use the A5 cut level) averaged 1.8 shifts per pair before showing wear, compared to 1.1 shifts for the next best competitor. I know sample size is small—I’m only speaking from our three-month trial with 50 workers—but the data was clear enough for me to standardize. (Should mention: we kept the cheaper ‘backup’ brand for quick-change tasks where gloves get tossed after one use. That’s a separate decision.)

3. Speed of Delivery (Peregrine Top Speed, Literally)

Our local distributor processes Falcon orders within 24 hours, and delivery from their warehouse takes about an hour. I’m not exaggerating—they call it their “peregrine top speed” service. When we had an emergency shutdown last quarter, I needed 500 masks by 6 AM the next day. They delivered by 5:30. That kind of reliability makes my life way easier.

Where I Push Back: The Honest Limitations

Look, Falcon isn’t for everyone. If you’re managing a pet pharmacy (like buying Simparica for dogs) or a completely different industry, my experience won’t map. I’ve only worked with industrial PPE suppliers—I can’t speak to pharmaceutical logistics. Also, if your facility deals with extreme chemicals (think concentrated acids), you might need a specialized glove beyond Falcon’s standard line. Our safety officer flagged that once.

Another thing: pricing. Falcon’s per-unit cost is about 15% higher than the median. I used to think that was a deal-breaker. But after accounting for returns, complaints, and reorders, the total cost of ownership is actually lower. I only realized that after my 2023 mistake—so yeah, I still kick myself for not running the numbers earlier.

Counterargument: “But Cheaper Ones Work Fine”

I get it. I’ve heard, “We’ve used Brand X for years without issues.” Maybe you have. But check your data: do you track rejection rates per shift? Do you measure near-miss incidents? In our experience, the “fine” brands hit minimum spec—nothing more. Falcon consistently exceeds spec by about 20% across most metrics. That margin matters in mining where a ripped glove can mean a lost finger.

Bottom Line

Falcon masks and gloves are my first choice for industrial environments, but I always recommend verifying fit and testing a sample batch before committing. My experience is based on about 200 orders over three years—your mileage might vary, especially if you’re outside mining or energy. Prices as of late 2024 were roughly $0.80–$1.20 per mask and $1.50–$2.00 per glove pair (verify current rates). The market moves fast, but the principle doesn’t: choose reliability over cheap upfront costs, and know when a product isn’t right for you.

Soren Valgaard

Soren Valgaard covers surface and underground drill rigs, rotary drills, core drills, rock drills, DTH hammers, drill bits, and rock-reinforcement equipment. His evaluations reference ISO 18758-1 while comparing hole diameter, drilling depth, penetration rate, feed force, compressor demand, rod handling, fuel use, and rig stability. He helps mine engineers and equipment buyers match drilling systems to geology, bench design, production targets, operator safety, mobility, and maintenance conditions.