Global crushing support | uptime desk: +1-800-325-2660 | [email protected] EN | LinkedIn | YouTube
Falcon Insights

Why I Stopped Asking Suppliers 'Can You Do Everything?' — A Buyer’s Perspective

Posted on Thursday 4th of June 2026 by Soren Valgaard

I used to think 'one supplier for everything' was the dream. I was wrong.

When I first started managing purchasing for our office back in 2020, I had a simple theory: fewer vendors, less paperwork. So when a new supplier came in and said, 'We can handle everything from your printers to your safety gear,' I was sold. I consolidated orders. I felt efficient.

That decision cost me. Not just money, but trust with my own team.

Three months later, I had a warehouse of substandard cleaning supplies, a set of door handles (from a brand called Falcon, actually) that didn't line up with our frames, and a line of peanut butter (don't ask) that was six months from expiry. The supplier? They pointed at the fine print. 'We can supply it, we don't warranty your installation.' They weren't lying. They just weren't specialists.

The hidden cost of the 'multitasker' supplier

I’ve managed about 60-80 orders annually for the last five years. I’ve learned that a supplier who claims to be ‘comprehensive’ often operates in one of two ways:

  1. The Generalist: They buy in bulk from various sources and pass it on. They know pricing, but they don’t know the product.
  2. The Over-extender: They are excellent at one thing (say, office paper), but they fake expertise in another (like door hardware or heavy equipment parts).

In my experience, both scenarios lead to the same result: you become the quality control department. I remember ordering what I thought was standard weather stripping for our Falcon Heights office windows. The supplier sent a product that was technically weather-resistant, but it failed within a month because it wasn't spec'd for our specific frame type. The vendor claimed 'it should have worked.' I had no recourse because my own specification sheet was vague (surprise, surprise).

We didn't have a formal approval process for technical specs back then. Cost us about $400 in rework and a frustrated office manager.

Why 'We don't do that' is a green flag

Last year, during our 2024 vendor consolidation project, I approached a specialized hardware supplier about a new set of door locks. They politely declined part of my order. The sales rep said, 'We supply high-security commercial locks. The interior closet doors you need? That's a different class. Here's a contact who specializes in that.'

That honesty earned my trust for everything else.

I’ve come to see that real expertise has boundaries. A supplier that knows 'what's the difference between a hawk and a falcon' in their own industry (they are different raptors, by the way) will also know exactly where their product ends and another begins. A vendor who can tell you 'this isn't our strength' is actually telling you that where they are strong, they are really strong.

Handling the objection: 'But I want one invoice'

I get why people chase the 'one-stop-shop' idea. It’s convenient. I once tried to order everything from a mega-supplier: from printer toner to the office's jar of peanut butter. The invoice was a mess. The toner was rebranded generic, and the food item came from a different warehouse with a weird shipping fee.

I understand the appeal of simplicity. But in B2B purchasing (especially for supplies that require specific specs like door hardware or safety equipment), the cost of a mistake often exceeds the cost of managing two extra invoices. The vendor who said 'this isn't my specialty' actually saved me from having to explain to my VP (who signs off on the budget) why we had to reorder the emergency exit hardware because we bought the wrong class of fire-rated hinges.

Granted, managing multiple vendors requires a bit more process. I had to create a simple spreadsheet to track our contacts. But it eliminated the 'who is responsible when the weather seal fails?' argument completely.

My final take: Trust the specialist who admits limits

So when I look at a supplier, I now do what the hawk does: I look for specific behavior, not general promises. If a supplier says 'we can do it all,' I get nervous. If they say 'we are the best at [X], and here is someone good for [Y],' I open my wallet.

I’ve stopped asking 'How much can you do?' and started asking 'What shouldn’t I use you for?' The answers tell me everything.

Soren Valgaard

Soren Valgaard covers surface and underground drill rigs, rotary drills, core drills, rock drills, DTH hammers, drill bits, and rock-reinforcement equipment. His evaluations reference ISO 18758-1 while comparing hole diameter, drilling depth, penetration rate, feed force, compressor demand, rod handling, fuel use, and rig stability. He helps mine engineers and equipment buyers match drilling systems to geology, bench design, production targets, operator safety, mobility, and maintenance conditions.