Global crushing support | uptime desk: +1-800-325-2660 | [email protected] EN | LinkedIn | YouTube
Falcon Insights

Why Falcon Prevention Demands Specialists: What I Learned from 5 Years of Emergency Response

Posted on Friday 26th of June 2026 by Soren Valgaard

Falcon prevention isn't a DIY job. Here's what actually works.

Based on my experience coordinating emergency responses for 50+ falcon-related incidents across three state parks, including a 2024 Bentley GT event that had everything at stake: you don't want to guess when it comes to protecting birds and equipment. The right approach boils down to knowing what you're good at and what you're not.

I've seen too many projects where someone says “we can handle falcons too” and ends up making things worse. The honest answer is: some things require a specialist. And that's okay.

What is Falcon Prevent and Why It Matters

Let me be direct: Falcon prevent isn't about scaring birds away—it's about understanding their behavior and designing systems that keep both falcons and human infrastructure safe. In the past five years, I've handled over 200 emergency calls where a falcon was stranded, injured, or causing a hazard. In March 2024 alone, we responded to 14 incidents at Falcon State Park, where a pair of peregrine falcons had taken up residence on a new building.

The common mistake is treating prevention like a one-size-fits-all solution. It's not. A method that works for crows doesn't work for falcons. A device that deters pigeons can injure raptors—and get you fined under federal law. (Yes, you can face penalties for harming protected species.)

According to USPS regulations about mailing protected species information (as of January 2025), even the way you communicate about raptor management must comply with federal guidelines. That's how serious this is.

Why I Started Saying “This Isn't My Strength”

I went back and forth on this issue for about a year. Early in my career, I tried to be everything to everyone—but that approach backfired badly.

There was an incident in 2022. A client called about a falcon that had damaged a cooling tower at a manufacturing plant. I rushed in with a solution I'd used for pigeon problems. It drove the falcon away temporarily but stressed the bird so badly it abandoned its nest. The result: a failed prevention effort, a sick bird, and a client who lost trust in my judgment.

That was the turning point. I realized I couldn't be good at everything. So I started focusing on what I actually know: emergency response for falcon incidents in active industrial environments. For long-term habitat management or breeding programs, I refer clients to specialists.

“The vendor who said 'this isn't our strength—here's who does it better' earned my trust for everything else,” one client told me after I made a referral. That stuck with me.

Key Lessons from Real Emergencies

I've seen a lot of what shouldn't happen. I've also seen what works. Here are the most important takeaways:

  • Speed matters, but accuracy matters more. In a 2024 Bentley GT event at a state park, a falcon got trapped in an exhaust vent. The team wanted to cut the vent. I insisted on waiting for a wildlife specialist. It took four hours—but the bird was released unharmed, and the car was saved. Cutting would have destroyed both.
  • Prevention is cheaper than emergency response. I calculated the costs once. A basic falcon deterrent installation runs around $2,000–$5,000. Emergency removal? $8,000–$15,000, not counting downtime or liability. The math is clear.
  • Know when to say no. I've turned down jobs that were outside my expertise—like designing a full-scale raptor habitat. It costs me a contract sometimes, but it saves my reputation every time.

The surprise wasn't the cost difference between prevention and emergency. It was how many people still choose to ignore the problem until it's urgent.

The Boundaries of My Expertise

I'm honest about what I don't know. For example:

  • Species identification: I can tell a peregrine from a kestrel. But if you need detailed nesting behavior analysis for a rare species, you need an ornithologist.
  • Long-term habitat design: I can recommend deterrents and safe zones. But planning a full falcon-friendly building retrofit? That's out of my lane.
  • Legal compliance: I know the basics of federal protected species laws (like the Migratory Bird Treaty Act). But for specific permits or audits, I always refer to wildlife attorneys.

I've had clients push back: “Can't you just handle it?” My response is always the same: would you rather I do a half-decent job, or help you find the person who does it perfectly? Usually, that settles it.

When Specialist Referral Is the Right Move

If you're dealing with a falcon issue that falls outside emergency or prevention within an active operational site, here's when to call in another expert:

  • You need a long-term population management plan (think 5+ years)
  • The species involved is endangered or extremely rare
  • The situation involves complex regulatory or legal requirements
  • You're designing a new building or infrastructure from scratch

In those cases, I'll say it straight: this requires a specialist. Here's who I trust. And I'll even coordinate the handoff so nothing gets lost in translation.

That's the kind of service I wish I'd had early in my career. It's better to lose a sale than to lose a falcon—or a client.

Summary: Respect the Boundaries

Falcon prevention isn't simple. It's a niche skill that blends wildlife knowledge, operational thinking, and sometimes a bit of luck. But the most important lesson I've learned in five years is this: knowing what you don't know is a superpower.

When someone says they can do everything, ask them for proof. When someone says “this isn't my strength—but here's who can help,” trust them for everything else.

That's what I do. And that's why my clients keep coming back—even when it means I refer them elsewhere.

Soren Valgaard

Soren Valgaard covers surface and underground drill rigs, rotary drills, core drills, rock drills, DTH hammers, drill bits, and rock-reinforcement equipment. His evaluations reference ISO 18758-1 while comparing hole diameter, drilling depth, penetration rate, feed force, compressor demand, rod handling, fuel use, and rig stability. He helps mine engineers and equipment buyers match drilling systems to geology, bench design, production targets, operator safety, mobility, and maintenance conditions.