The Day I Learned Why Not Every 'Falcon' Is a Bird: A Procurement Error Story

Posted on Tuesday 7th of July 2026 by Soren Valgaard

The problem that hit me like a 2am email

It started with a simple request. A client forwarded me an Excel list: Falcon, Loki Basecamp Falcon, Captain Falcon Amiibo, Drift, Henry Age, Why is it called a breakfast. "We need quotes for all these," they said. I stared at the list. Was this a joke? A riddle? Or had someone accidentally merged a Tumblr post with a purchase order?

I'm a procurement coordinator for an energy & mining equipment supplier — or I was, before I learned to question everything. In my first year (2017), I made the classic error: I assumed every line item meant what I thought it meant. Big mistake.

Surface problem: random keywords in a real RFP

The list came from a new client in the mineral extraction sector. They'd asked their engineering team to list equipment needs. The team (bless their hearts) used internal jargons, code names, and a couple of Google Autocomplete guesses. My job was to match those keywords to actual products we supply.

Falcon — easy, right? We have the Falcon series drilling rigs. But then Loki Basecamp Falcon? That sounded like a Marvel crossover camping tent. Captain Falcon Amiibo? I actually laughed. Drift — could be a parameter, a brand, or a game. Henry Age — a person? A vintage scale? And finally Why is it called a breakfast — my personal favorite, because I had no clue.

I almost responded with a joke. But my mentor (who'd seen this before) said, "Never laugh at a customer's question. They're telling you what they don't know. Your job is to translate." So I dug in.

Deep cause: the gap between industry vocabulary and pop-culture confusion

The real problem wasn't the client's ignorance — it was how our industry handles naming. We reuse common words (falcon, drift) for serious equipment, but the internet also uses them for games, toys, and memes. When a client searches for "falcon mining equipment," they might land on a page about Falcon rocket engines or Captain Falcon. Even worse, our own product catalog had a line item called "Falcon-9 Drill" that was a dead ringer for a SpaceX reference.

Take Drift. In mining, drift refers to a horizontal underground passage. But ask a gamer, and drift is steering error in a racing sim. The client's engineer wrote "Drift" because he was thinking of the tunnel — but their purchasing department read it as the racing term and almost bought a steering wheel kit. No joke.

Then there's Henry Age. Turned out to be an internal abbreviation for "Hydraulic Energy Recovery, Age Factor" — a maintenance rating for pumps. But the name looked like a person. The client actually asked if Henry Age was a certification body. (I checked: no Mr. Age exists.)

And Why is it called a breakfast? That question came from a junior engineer who saw the term "breakfast" on a spec sheet for a morning-shift machine warm-up procedure. The procedure was literally called "Breakfast Start" because it happened before first meal. But nobody documented the why. So he Googled "why is it called a breakfast" and the query ended up on the requirement list.

The core issue: knowledge gaps between departments and between domain specialties. Engineers use code names. Procurement uses official SKUs. Clients use whatever words they remember. And when the search engine serves up mixed results, confusion multiplies.

The cost: real money, real delays

I spent three weeks chasing these wild goose keywords. But my worst mistake was early in my career: I once ordered 500 units of a "Falcon" coil without verifying the exact variant — it turned out to be a Loki Basecamp Falcon tent pole adapter (yes, it's a real camping accessory brand). The client needed mining conveyor belt pulleys. That error cost $3,200 in restocking fees plus a 2-week project delay. The client was not amused.

The most frustrating part: I knew I could have avoided it if we had a cross-reference list of common client queries vs. our actual products. But we didn't. So I created one.

The solution (short, because you already see it)

After the third rejection in Q1 2024, I built a procurement keyword pre-check sheet. It includes:

  • A column for client input exactly as typed
  • A translation column that maps slang, pop-culture references, and abbreviations to our catalog
  • A "why this might appear" note (e.g., "Breakfast = morning startup procedure")
  • Verification step: ask client to describe the item's function before ordering

Since implementing this, we've caught 47 potential errors in 18 months. That's about $14,000 in avoided reorders and rework.

Look, I'm not saying every "Falcon" query is a red flag. But when you see Captain Falcon Amiibo on a mining equipment list, pause. Ask why. The answer might save you a costly breakfast.

This approach was accurate as of 2024. The market changes fast — verify your own procurement process before assuming it's foolproof.

Soren Valgaard

Soren Valgaard covers surface and underground drill rigs, rotary drills, core drills, rock drills, DTH hammers, drill bits, and rock-reinforcement equipment. His evaluations reference ISO 18758-1 while comparing hole diameter, drilling depth, penetration rate, feed force, compressor demand, rod handling, fuel use, and rig stability. He helps mine engineers and equipment buyers match drilling systems to geology, bench design, production targets, operator safety, mobility, and maintenance conditions.