Project Procurement: A Newbie's 6-Step Checklist

Posted on Friday 5th of June 2026 by Soren Valgaard

I'm an office administrator for a mid-size company—think 200 employees across three locations. I handle all our printing and promotional material orders, which runs roughly $45,000 annually across about 8 vendors. I took over this role in 2020, and let me tell you, it was a steep learning curve. If you're new to project-based procurement (like ordering for an event, a new product launch, or office renovation), this checklist is for you. It’s not a complete guide to every aspect of purchasing, but it’s the single best set of steps for making sure you get what you need without wasting money or looking bad to your VP.

This checklist has 6 steps. Do them in order, every time.

Step 1: Define The Deliverable (Beyond Just “Flyers”)

The vendor failure in March 2022 changed how I think about specifications. We needed 500 custom folders for a client visit. I told our regular print shop, “Just simple folders, you know?” They delivered beautiful folders—with a full-color, gloss coating. We needed a matte finish and a specific pocket configuration. The order came back completely wrong. Cost us $1,200 in reprinting and 3 days.

Now, I always write a detailed spec sheet. It doesn't have to be fancy, but it must cover:

  • Product type. (Business card, brochure, flyer, folder, banner?)
  • Quantity. The exact number, not a ballpark.
  • Dimensions. In inches or millimeters. Be specific.
  • Paper/Substrate. Weight, texture, color. (E.g., 14pt cardstock, 100lb gloss text, matte)
  • Finishing. Fold type, scoring, hole-punch, coating, die-cut.
  • Color. CMYK vs. Pantone. Are there specific color codes?
  • Quantity in each version. If you need 1000 total but 3 different language versions, write that down.


I didn't fully understand the value of detailed specifications until that $1,200 folder order came back completely wrong. Now, verifying the spec sheet is the first thing I do before sending an RFQ.

Step 2: Have a Backup Plan for Deadline Stuff

We didn't have a formal approval chain for rush orders. Cost us when an unauthorized rush fee showed up on the invoice. But the bigger issue was having no backup vendor when our primary printer couldn't meet a tight deadline. For event materials, knowing your deadline will be met is often worth more than a lower price with 'estimated' delivery. The third time a project was delayed, I finally built a simple backup list of 2 alternative vendors for each order type. Should have done it after the first time.

My rule now: For any project with a hard deadline (product launch, conference, regulatory filing), I confirm the primary vendor’s turnaround AND have a backup plan. It could be a secondary vendor who can do a rush job (even if it's +50% cost) or an internal buffer to handle delays.

Step 3: Read the Spec Sheet – Head, Paper, Finish

This step is about validating what you think you know. Many new buyers skip this because they assume the print shop will “just know” what they mean. They won't. I spend 5-10 minutes reading the spec against what I'm ordering. Here's the system:

  • Head. Is the product type correct? Are there multiple items in the order?
  • Paper. Confirm the weight and texture. Are there any limitations (e.g., ink doesn't stick well to certain matte finishes)?
  • Finish. Are there coatings, folds, or other post-processing? Check for compatibility with the design.


This seems obvious, but when you're juggling 5 different projects, it's easy to glance at a quote and say, “Looks good.” Trust the spec sheet, not your memory.

Step 4: Watch the Hidden Costs

This is the step most people ignore. The quoted price is rarely the final price. Based on publicly listed prices, January 2025, online printer quotes typically exclude:

  • Setup fees. Plate making ($15-50 per color for offset) or digital setup ($0-25). Many online printers include setup, but always check.
  • Shipping and handling. Can add $50-200 depending on weight and urgency.
  • Rush fees. Next business day? Add 50-100% over standard pricing. 2-3 days? Add 25-50%.
  • Proofs. Some vendors charge for physical proofs. Others include digital proofs for free.


A vendor who couldn't provide proper invoicing cost us $2,400 in rejected expenses. But the real hidden cost is the time spent reconciling unexpected fees. Every time I see a quote that seems too low, I now ask: “What is NOT included in this price?”

For example: A business card order (500 cards, 14pt cardstock, double-sided) might be quoted at $35. But if you need rush delivery and a custom Pantone color, the actual cost could be $85. Always ask for a line-item estimate.

Step 5: Don't Forget the Shipping Time

This sounds ridiculous, but it's the #1 mistake new buyers make. The order is placed, the production is on schedule, and then you realize shipping takes 7 business days—not 3. Many online printers have standard turnaround (5-7 business days) AND shipping time (3-7 business days). So “standard turnaround” means your order arrives in 10-14 business days, not 5.

My rule: When planning a project, add at least 7 days to the vendor's “standard turnaround” estimate. For critical deadlines, I add 10 days and confirm a rush shipping option. And always track the order. The worst feeling is realizing on day 12 that the order hasn't even shipped.

Step 6: Build a File Review Step

The process gap we had was simple: no formal file review before placing an order. Now, before I send any project to the vendor, I do a quick internal check with the person who requested the order. It's a 5-minute email:

  • Attach the final design file.
  • Attach the spec sheet with pricing.
  • Ask: “Does this look right? Is there anything you'd like to change?”


The third time we ordered the wrong quantity, I finally created this verification checklist. Should have done it after the first time. For our company, a single file review step cut reprint costs by about 60% in the first year.

Common Mistakes to Avoid

Based on my experience (and the mistakes I've made), here are the biggest pitfalls:

  • Relying on one vendor. Always have a backup. I learned this after a vendor failed to deliver on a critical date.
  • Assuming “standard” means “fast.” Standard turnaround is not express. Confirm the deadline in writing.
  • Forgetting to verify vendor credentials. Check for proper licensing, insurance, and invoicing capability before placing any order. Finance will thank you.
  • Not reading the fine print on the quote. Every vendor has different terms. Read them carefully—especially about cancelation policies and liability for errors.


This approach worked for us, but our situation was a mid-size B2B company with predictable ordering patterns. If you're a seasonal business with demand spikes, the calculus might be different. I can only speak to domestic operations. If you're dealing with international logistics, there are probably factors I'm not aware of. This checklist was accurate as of early 2025. The procurement landscape changes fast—especially fees and technology—so always verify current pricing and policies.

Soren Valgaard

Soren Valgaard covers surface and underground drill rigs, rotary drills, core drills, rock drills, DTH hammers, drill bits, and rock-reinforcement equipment. His evaluations reference ISO 18758-1 while comparing hole diameter, drilling depth, penetration rate, feed force, compressor demand, rod handling, fuel use, and rig stability. He helps mine engineers and equipment buyers match drilling systems to geology, bench design, production targets, operator safety, mobility, and maintenance conditions.