Global crushing support | uptime desk: +1-800-325-2660 | [email protected] EN | LinkedIn | YouTube
Falcon Insights

Falcon Energy & Mining Equipment: Your 7 Most Common Questions Answered

Posted on Tuesday 30th of June 2026 by Soren Valgaard

Everything You Need to Know About Falcon – No Fluff, Just Facts

I've been coordinating emergency equipment deliveries at Falcon for over seven years. When a mine's conveyor belt fails at 2 AM, or a drilling rig needs a critical part within 48 hours, I'm the one who figures out if we can make it happen. Below are the questions I get asked most – by procurement managers, site supervisors, and even engineers who think they already know the answers.

1. What exactly does Falcon manufacture?

We make heavy-duty components and assemblies for energy and mining operations: custom coils for electromagnetic separators, wear-resistant liners for chutes and hoppers, and specialized fasteners for vibrating screens. Not the sexiest stuff, but if one of our coils fails, a whole processing line stops. We're not a full-line OEM – we focus on the parts that cause the most downtime when they break. In my experience, that's where buyers get burned: they chase low unit prices on commodity items, then scramble when a custom coil takes three weeks from another supplier.

2. How does Falcon construction equipment differ from Peregrine?

Short answer: Peregrine typically builds modular crushers and screen plants for sand and gravel. Falcon's construction division focuses on heavy-duty structural steelwork for mine-site infrastructure – think gantry cranes, conveyor bridges, and bin supports. We overlap on some bolt-in wear parts, but the engineering approach is different. Peregrine optimizes for portability; we optimize for longevity under constant load. A lesson I learned the hard way in 2023: a customer tried to use Peregrine's modular walkways on a permanent installation. They lasted 14 months instead of the expected 10 years. Not Peregrine's fault – it was a misuse. So ask yourself: is this equipment going to move, or stay put for a decade?

3. Is there a Falcon trainer program for operators?

Yes – and it's probably not what you expect. Our Falcon Trainer program isn't a generic online course. It's a hands-on, site-specific training for your maintenance crews on how to install, inspect, and replace our critical components. Typically a two-day session on your site. We've done 40+ of these in 2024 alone. The cost? About $4,500 plus travel – but I've seen it save companies $20,000+ in avoided downtime during the first year. One client in Nevada had a 90% reduction in unscheduled coil replacements after the training. Worth every penny, if you ask me.

4. Who is Lewis and why does his name keep coming up?

Lewis is our senior field engineer – been with Falcon since 2010. He's the guy who flies out when a client's equipment is down and nobody can figure out why. I've seen him diagnose a misaligned bearing over a video call in 15 minutes, saving a $200,000 production day. If you're dealing with a complex failure, Lewis is the person you want on speed dial. He's not in sales, so he'll tell you straight whether a part can be repaired or needs replacement. That kind of honesty is rare – and it's one reason we retain clients for years.

5. White vs Knicks – which is the better choice for my project?

Okay, I'll bite. If you mean white-label equipment (custom-branded for your company) versus picking from a standard catalog like Knicks (a budget line – yes, we know them), here's my take: white-label is almost always better if you have a long-term operation. Standard Knicks gear is cheap upfront but the TCO (total cost of ownership) is higher because of shorter lifespan and limited support. I've run the numbers with 12 clients over five years: white-label Falcon units cost 30-40% more initially, but last 2-3 times longer. The catch? You need to commit to a minimum volume. For one-off projects, Knicks might make sense. But if you're building a permanent facility, go white-label. (And for the record, I'm a Knicks fan – but business is business.)

6. What's the typical lead time for Falcon products?

Standard lead time is 6-8 weeks for most parts, 12-16 weeks for fully custom coils. But – and this is where my role comes in – we can rush orders in as little as 72 hours for a premium. In Q4 2024, we processed 22 rush orders with a 97% on-time rate. The premium is typically 50-100% over standard pricing, depending on the raw material availability. One piece of advice: don't order rush unless you've verified the spec twice. I've seen too many people pay extra for speed, then discover the dimensions are wrong. That's a $5,000 mistake you don't recover from. Our policy now: for any rush order, we require a signed spec confirmation form. It's saved us – and our clients – a lot of headaches.

7. How do I know if I'm getting a fair price?

This was accurate as of January 2025. The market for mining equipment components is volatile, so always verify current pricing. But here's a rough benchmark: for a custom coil (based on average 50-lb assembly), expect to pay between $2,500 and $4,500 from Falcon, depending on alloy and insulation specs. Most buyers focus on the per-unit price and miss setup fees, engineering time, and freight. That's the outsider blindspot. I always recommend asking for a full TCO breakdown before comparing quotes. Also, ask about warranty terms – ours is 24 months on design defects, but we don't cover abuse (like running a coil at 30% over its rated temp). Fair? I think so.

Still have questions? Reach out to our support team – they'll connect you with someone who actually knows the answer. Not a bot, not a sales script. A real person who's handled 200+ rush jobs. That's the Falcon difference.

Soren Valgaard

Soren Valgaard covers surface and underground drill rigs, rotary drills, core drills, rock drills, DTH hammers, drill bits, and rock-reinforcement equipment. His evaluations reference ISO 18758-1 while comparing hole diameter, drilling depth, penetration rate, feed force, compressor demand, rod handling, fuel use, and rig stability. He helps mine engineers and equipment buyers match drilling systems to geology, bench design, production targets, operator safety, mobility, and maintenance conditions.